The choice of crusher and mill industry

brixton metals intersects m of g t ageq

  • Brixton Metals Intersects 95m of 904 g/t AgEq Including 9

    Brixton Metals Intersects 95m of 904 g/t AgEq Including 9.25m of 3,646 g/t AgEq (2,984 g/t Ag, 3.04 g/t Au and 11.7% Pb) VANCOUVER, BC, January 05, 2012 Brixton Metals Corporation (TSX-V: BBB) (the “ Company ” or “ Brixton ”) is pleased to announce assay results from the balance of the 2011 drilling program at its Thorn gold-silverBrixton Metals Intersects 95m of 904 g/t AgEq Including 9,Jan 05, 2012· Brixton Metals Intersects 95m of 904 g/t AgEq Including 9.25m of 3,646 g/t AgEq (2,984 g/t Ag, 3.04 g/t Au and 11.7% Pb)Brixton Metals Drills 83.9m of 296.50 g/t AgEq including,THN12-72 intersected 53.00m of 254.29 g/t AgEq (126.54 g/t Ag, 1.57 g/t Au, 0.37% Pb and 1.09% Zn) from 22m depth within a broader interval of 104.85m of 173.66 g/t AgEq (88.01 g/t Ag, 1.10 g/t Au

  • Brixton Metals Drills 6.7m of 937.3 g/t AgEq and 3.0m of 0

    Mar 15, 2018· Brixton Metals Drills 6.7m of 937.3 g/t AgEq and 3.0m of 0.25% CoEq at its Hudson Bay Project in the Cobalt Camp, Ontario. Email Print Friendly Share. March 15, 2018 09:00 ETBrixton Metals Drills 83.9m of 296.50 g/t AgEq including,Brixton Metals Drills 83.9m of 296.50 g/t AgEq including 12.9m of 769.42 g/t AgEq Vancouver, British Columbia, September 4, 2012 · THN12-65 from surface intersected 12.90m of 769.42 g/t AgEq (512.66 g/t Ag, 1.72 g/t Au, 4.24% Pb and 1.54% Zn) within a broader interval of 83.90m of 296.50 g/t AgEq (161.81 g/tBrixton Metals Drills 6.7m of 937.3 g/t AgEq and 3.0m of 0,Brixton Metals Drills 6.7m of 937.3 g/t AgEq and 3.0m of 0.25% CoEq at its Hudson Bay Project in the Cobalt Camp, Ontario March 15, 2018 Brixton Metals Corporation (TSXV: BBB) (the “ Company ” or “ Brixton ”) is pleased to announce additional drill results from its wholly owned Hudson Bay project located in the Cobalt Camp, Ontario.

  • Brixton Metals Drills 83.9m of 296.50 g/t AgEq including

    Sep 04, 2012· VANCOUVER, BRITISH COLUMBIA-- Brixton Metals Corporation is pleased to announce the results of the 2012 phase one drilling program at its silver and gold high grade Thorn project, located in NorthwestBrixton Metals Drills 83.9m of 296.50 g/t AgEq including,Sep 04, 2012· Brixton Metals Corporation is pleased to announce the results of the 2012 phase one drilling program at its high grade silver and gold Thorn project, located in Northwest British Columbia..Brixton Metals TSX.V : BBB Unlocking value in high-grade,Drill results returned: 95m of 1.71 g/t Au, 628 g/t Ag plus base metals; 554m of 2 g/t AuEq including 136m of 5 g/t AuEq. Deposit types include sediment and volcanic hosted Au-Ag, high-sulphidation Ag-Cu-Au veins/breccia and porphyry Cu-Au. An inferred resource of 21.5M AgEq was established in 2014 and remains open for expansion.

  • GoGold Intersects 29.8m of 713 g/t AgEq, including 4.5m of

    The intersect included 4.5m of 4,251 g/t AgEq, which was made up of 3,289 g/t silver and 12.83 g/t gold. The hole was set up to twin historical RC drill hole TRRC-32 completed by TUMI Resources in.Brixton Metals Drills 83.9m of 296.50 g/t AgEq including,THN12-72 intersected 53.00m of 254.29 g/t AgEq (126.54 g/t Ag, 1.57 g/t Au, 0.37% Pb and 1.09% Zn) within a broader interval of 104.85m of 173.66 g/t AgEq (88.01 g/t Ag, 1.10 g/t Au, 0.24% Pb andBrixton Metals Drills 6.7m of 937.3 g/t AgEq and 3.0m of 0,Mar 15, 2018· Brixton Metals Drills 6.7m of 937.3 g/t AgEq and 3.0m of 0.25% CoEq at its Hudson Bay Project in the Cobalt Camp, Ontario. Email Print Friendly Share. March 15, 2018 09:00 ET

  • Brixton Metals Drills 83.9m of 296.50 g/t AgEq including

    Sep 04, 2012· Brixton Metals Corporation is pleased to announce the results of the 2012 phase one drilling program at its high grade silver and gold Thorn project, located in Northwest British Columbia..Brixton Metals Drills 6.7m of 937.3 g/t AgEq and 3.0m of 0,Brixton Metals Drills 6.7m of 937.3 g/t AgEq and 3.0m of 0.25% CoEq at its Hudson Bay Project in the Cobalt Camp, Ontario. Hailey Wahlberg March 15th, 2018.Brixton Metals Drills 1.98% Cobalt, 15,436.00 g/t Silver,May 09, 2018· Brixton Metals Drills 1.98% Cobalt, 15,436.00 g/t Silver over 1.00m within 7.87m of 2,787.26 g/t Silver, 0.27% Cobalt and Intersected 70.65m of Nickel-Cobalt-Silver in Archean Basement

  • Brixton Metals Drills 83.9m of 296.50 g/t AgEq including

    Sep 04, 2012· VANCOUVER, BRITISH COLUMBIA-- Brixton Metals Corporation is pleased to announce the results of the 2012 phase one drilling program at its silver and gold high grade Thorn project, located in NorthwestSilver Tiger Intersects 2,049 g/t AgEq over 0.5 Meters on,Nov 17, 2020· Hole 163 on the Protectora Vein 0.5 meters grading 2,049.1 g/t AgEq from 16.9 meters to 17.4 meters consisting of 1,782 gpt Ag and 3.56 gpt Au and a second intercept of 0.5 meters grading 1,440.6 gpt AgEq from 51.9 meters to 52.4 meters consisting of 1,374 gpt Ag and 0.89 gpt AuBrixton Metals Drills 83.9m of 296.50 g/t AgEq including,Sep 04, 2012· The objectives of this program were to confirm the results from the 2011 high-grade discovery of the Oban hole THN11-60 (from surface 95.08m of 904 g/t AgEq (628.30 g/t Ag, 1.71 g/t Au, 3.31% Pb, 2.39% Zn and 0.12% Cu) and to obtain further

  • GoGold Intersects 29.8m of 713 g/t AgEq, including 4.5m of

    The intersect included 4.5m of 4,251 g/t AgEq, which was made up of 3,289 g/t silver and 12.83 g/t gold. The hole was set up to twin historical RC drill hole TRRC-32 completed by TUMI Resources inBrixton Metals Drills 1.38% Cobalt, 63.00 g/t Silver over,April 30, 2018 TheNewswire Brixton Metals Corporation (TSXV: BBB) (the "Company" or "Brixton") is pleased to announce drill results from its wholly owned Hudson Bay project located in the Cobalt Camp, Ontario, Canada. Highlights from 8 drill holes Drill hole HB18-23 intersected 2.00m of 1.38% cobalt, 63.00 g/t silver from 133m depth Drill hole HB18-23 intersected 23.00m of 55.55 g/tBrixton Metals Expands the OBAN Zone and Drills up to,Aug 28, 2013· THN13-95 is a new silver-copper zone of pyrite-tetrahedrite mineralization located 200 metres from hole 60. THN13-95 returned 5.00 metres of 227.33 g/t AgEq which includes 2.3 metres of 136.75 g/t Ag or 467.34 g/t AgEq at about 130 metres depth. This new zone includes hole THN13-112 which returned 3.60 metres of 317.36 g/t AgEq.

  • Brixton Metals Closes Its Acquisition of the Past Producer

    Includes 13.0 m of 12.05 g/t Au contained within 38.8 m of 4.93 g/t Au THUNDER BAY, ON, Sept. 10, 2020 /CNW/ PREMIER GOLD MINES LIMITED ("Premier", "the Company") (TSX:PG) (OTCPK:PIRGF) isBrixton Metals Expands the OBAN Zone and Drills up to,THN13-89 was drilled parallel to holes 83-84 and returned 1.00 metre of 1,060.00 g/t Ag or 1,167.46 g/t AgEq within 4.00 metres of 415.50 g/t Ag or 482.85 g/t AgEq and within a broader interval ofGoGold Intersects 29.8m of 713 g/t AgEq, including 4.5m of,Aug 05, 2020· The intersect included 4.5m of 4,251 g/t AgEq, which was made up of 3,289 g/t silver and 12.83 g/t gold. The hole was set up to twin historical RC drill hole TRRC-32 completed by TUMI Resources in 2007, with both holes entering and exiting the mineralized zone at similar depths and both carrying high grade silver and gold mineralization.

  • Brixton Metals Drills 6.7m of 937.3 g/t AgEq and 3.0m of 0

    Brixton Metals Drills 6.7m of 937.3 g/t AgEq and 3.0m of 0.25% CoEq at its Hudson Bay Project in the Cobalt Camp, Ontario. Hailey Wahlberg March 15th, 2018.Brixton Metals Drills 4m of 370 g/t Ag including 1m of,Jan 08, 2021· Figure 1 Location of the Shaft 3 Drilling Area Figure 2 Pseudo-Cross Section All Drilling near Shaft 3 with Silver Results Figure 3 Hole LM-20-113 from 5.9m, Native Silver and Cobaltite in Quartz-Carbonate Veins Figure 4 Hole LM-20-111 at 113.0m to 113.5m, Massive Chalcopyrite, Pyrite, and Pyrrhotite Hosted within Conglomerate, returned 10.85% Cu, 39.6 g/t Ag, 0.05% Co over Brixton Metals Drills 83.9m of 296.50 g/t AgEq including,Sep 04, 2012· The objectives of this program were to confirm the results from the 2011 high-grade discovery of the Oban hole THN11-60 (from surface 95.08m of 904 g/t AgEq (628.30 g/t Ag, 1.71 g/t Au, 3.31% Pb, 2.39% Zn and 0.12% Cu) and to obtain further

  • Brixton Metals News and Stock Quote (TSX.V: BBB) Junior

    Dec 18, 2020· Brixton Metals Drills 6.7m of 937.3 g/t AgEq and 3.0m of 0.25% CoEq at its Hudson Bay Project in the Cobalt Camp, Ontario Brixton Metals Intersects 10 Metres of 3.61 g/t Silver Tiger Intersects 2,049 g/t AgEq over 0.5 Meters on,Nov 17, 2020· Hole 163 on the Protectora Vein 0.5 meters grading 2,049.1 g/t AgEq from 16.9 meters to 17.4 meters consisting of 1,782 gpt Ag and 3.56 gpt Au and a second intercept of 0.5 meters grading 1,440.6 gpt AgEq from 51.9 meters to 52.4 meters consisting of 1,374 gpt Ag and 0.89 gpt AuGoGold Intersects 29.8m of 713 g/t AgEq, including 4.5m of,Aug 05, 2020· The intersect included 4.5m of 4,251 g/t AgEq, which was made up of 3,289 g/t silver and 12.83 g/t gold. The hole was set up to twin historical RC drill hole TRRC-32 completed by TUMI Resources in 2007, with both holes entering and exiting the mineralized zone at similar depths and both carrying high grade silver and gold mineralization.

  • Brixton Metals Closes Its Acquisition of the Past Producer

    Includes 13.0 m of 12.05 g/t Au contained within 38.8 m of 4.93 g/t Au THUNDER BAY, ON, Sept. 10, 2020 /CNW/ PREMIER GOLD MINES LIMITED ("Premier", "the Company") (TSX:PG) (OTCPK:PIRGF) isBrixton Metals Expands the OBAN Zone and Drills up to,THN13-89 was drilled parallel to holes 83-84 and returned 1.00 metre of 1,060.00 g/t Ag or 1,167.46 g/t AgEq within 4.00 metres of 415.50 g/t Ag or 482.85 g/t AgEq and within a broader interval ofBrixton Metals Drills 1.38% Cobalt, 63.00 g/t Silver over,April 30, 2018 TheNewswire Brixton Metals Corporation (TSXV: BBB) (the "Company" or "Brixton") is pleased to announce drill results from its wholly owned Hudson Bay project located in the Cobalt Camp, Ontario, Canada. Highlights from 8 drill holes Drill hole HB18-23 intersected 2.00m of 1.38% cobalt, 63.00 g/t silver from 133m depth Drill hole HB18-23 intersected 23.00m of 55.55 g/t

  • Brixton Metals (V.BBB) Page 7 PM Forum mexicomike.ca

    Sep 04, 2012· Brixton Metals Intersects 95m of 904 g/t AgEq Including 9.25m of 3,646 g/t AgEq (2,984 g/t Ag, 3.04 g/t Au and 11.7% Pb) VANCOUVER, BC, January 05, 2012 –Brixton Metals Corporation (TSX-V: BBB) (the “Company” or “Brixton”) is pleased to announce assay results from the balance of the 2011 drilling program at its Thorn gold-silverAbraPlata Intersects Further High-Grade Silver, Gold and,The broad zone of silver mineralisation in hole DDH 20-007 (61m @ 255.8 g/t Ag) intersected between 157 and 218m depth enhances the oxide silver resource, while the high grade gold mineralisation (2m @ 23.4g/t Au between 260-262m) demonstrates the potential for underground mineable gold.Equity Metals Intersects 0.3m Grading 56,115g/t Silver (1,Equity Metals Intersects 0.3m Grading 56,115g/t Silver (1,637opt (g/t) AgEq (g/t) Ag (g/t) Cu (%) 4 Corporate Update The Company today has given notice to the holders (“Holders”) of common share purchase warrants of the Company dated September 25, 2017 (the “Warrants”) of the acceleration of the expiry date of the

  • Brixton Metals Drills 1.98% Cobalt, 15,436.00 g/t Silver

    May 09, 2018· Brixton Metals Drills 1.98% Cobalt, 15,436.00 g/t Silver over 1.00m within 7.87m of 2,787.26 g/t Silver, 0.27% Cobalt and Intersected 70.65m of Nickel-Cobalt-Silver in Archean BasementBrixton Metals Announces Brokered Financing of up to $3,Aug 22, 2016· Brixton has established a maiden inferred resource of 21.5Moz AgEq from 7.4 Mt at 89.75 g/t AgEq. Brixton Metals Corporation shares trade on the TSX-V under the ticker symbol BBB .,

  • Stone crushing production Line
    Stone crushing production Line
    Mobile crushing production line
    Mobile crushing production line
    Ore beneficiation plant
    Ore beneficiation plant
    Sand making production line
    Sand making production line
    Marble crushing production line
    Marble crushing production line
    Powder grinding production line
    Powder grinding production line